Demurrage and detention are charges that arise when the free time on a container runs out. They are invisible on the quote and produce the largest difference when delivery slips.
They trigger in different places: one at the port yard, one outside it. This guide explains when and why each charge occurs, how to clarify them at the quotation stage and which steps prevent them.
What is demurrage?
Demurrage applies when a container is held at the port or terminal yard beyond the free time. It accumulates daily when unloading and pick-up from the yard are delayed.
The process depends on the container being released, customs procedures being completed and the pick-up plan from the yard. In busy periods, yard capacity and appointment systems also move the pick-up calendar.
Conditions change by line and port: free time, the charge table and how it escalates should be clarified on the quote. Even at the same port, different carriers can have different terms.
What is detention?
Detention is the usage charge for a container held outside the port by the shipper or the consignee. The container has been unloaded but has not been returned empty on time.
This charge is directly linked to how quickly the container is returned. Inland transport, the empty return to the depot and return appointments, planned together, reduce the detention risk.
Some arrangements price inland use and the outside-port period under different names; the quote should separate which item covers which stage.
How do you prevent waiting charges?
The most effective measure is preparing the destination-side work before the container arrives: complete documents, the customs file, an inland transport reservation and an empty return plan run as one chain. When the container arrives and the plan is missing, the free time burns fast.
Moving document preparation ahead of the shipment lowers the chance of waiting in customs. The commercial invoice, packing list and product-specific documents should be ready on the loading day.
Inland transport and the empty container return belong on the calendar too. When yard appointments, depot working hours and the delivery address capacity are planned together, the container leaves the yard on time.
- Document completeness and the customs file are ready before the container arrives.
- Inland transport and the empty return are written into the arrival calendar in advance.
- Free time and charge conditions are clarified at the quotation stage.
- Yard and appointment capacity are checked ahead of busy periods.
What conditions should you check on a quote?
When comparing two quotes, the waiting terms deserve a row: how many free days, what drives the charge and which stage each charge covers. Quotes that look similar in total can differ widely in waiting conditions.
Weigh the transit time and sailing frequency alongside them. A small delay in the delivery plan can turn into a large charge within a few days once the free time runs out.
Frequently asked questions
How long is the free time?
It varies by line, port and agreement. There is no general fixed period; the free-time conditions should be confirmed per container type and port at the quotation stage.
Can demurrage and detention accumulate together?
They trigger at different stages: when the container leaves the yard, demurrage stops and the outside-port period can start detention. Even when the conditions do not overlap, a chained delay raises the total quickly, which is why both stages should be planned together.
Who sets the charge table?
Conditions are set by line, terminal and agreement. When the shipper or consignee delays their own stage, the charge lands on their shipment; the distribution of responsibility is clarified with the quote scope.
Deliver your container on time
Share the destination port, the delivery address and the ready date. Our team builds the inland transport, customs and empty return plan on the shipment calendar and clarifies the free-time conditions at the quotation stage.

