Out-of-gauge construction and project cargo transport

Construction & Project Cargo Logistics

Construction & Project

We move out-of-gauge and heavy project cargo with the right equipment, route and permit plan.

At a glance

Sector summary

Compliance requirements
Out-of-gauge cargo requires route permits, escort conditions and time restrictions to be planned., For heavy and oversized equipment, lifting, installation and site delivery conditions are determined in advance., Multi-piece project shipments track piece-level inventory and assembly sequence., Energy and infrastructure projects include site safety and work permits in the operating plan.
Typical equipment
Lowbed and modular trailer vehicles, Flat rack and open top containers, Cranes, heavy lift and special loading gear, Heavy and oversized containers for project cargo
Transit time
Road 5–20 days: · Sea: 25–50 days · Rail: 18–35 days · Air: 2–8 days
What the sector needs
Out-of-gauge and heavy cargo planning, Route and permit coordination, Crane and special equipment selection, Project customs and documentation

Industry Overview

End-to-end planning in Construction & Project logistics

In construction and project cargo, dimensions, weight and route restrictions form the basis of the operation. We move your cargo with the right equipment and route plan.

We evaluate crane, lowbed, flat rack and open top container options according to the cargo dimensions.

Key Needs

What stands out in Construction & Project cargo

We build the operations plan around your cargo conditions and clarify the requirement list together.

  • Out-of-gauge and heavy cargo planning
  • Route and permit coordination
  • Crane and special equipment selection
  • Project customs and documentation
Compliance

What we watch closely in Construction & Project

  • Out-of-gauge cargo requires route permits, escort conditions and time restrictions to be planned.
  • For heavy and oversized equipment, lifting, installation and site delivery conditions are determined in advance.
  • Multi-piece project shipments track piece-level inventory and assembly sequence.
  • Energy and infrastructure projects include site safety and work permits in the operating plan.
Equipment

Commonly used transport options

  • Lowbed and modular trailer vehicles
  • Flat rack and open top containers
  • Cranes, heavy lift and special loading gear
  • Heavy and oversized containers for project cargo

Indicative Transit Times

Road 5–20 days
Sea
25–50 days
Rail
18–35 days
Air
2–8 days

Times are indicative and vary by route, sailing, border crossing and operating conditions.

Our Solutions

Our solutions for Construction & Project

We determine the right transport mode and equipment combination based on volume, delivery date and route.

01

Project cargo plan

We create an equipment and route plan based on dimensions, weight and delivery point.

02

Special equipment

We evaluate lowbed, flat rack, open top and crane loading options.

03

Permits and customs

We coordinate route permits and project customs steps together.

Frequently Asked Questions

Common questions about Construction & Project logistics

If you cannot find the answer to your question, you can reach us from the contact page.

How is the permit process handled for out-of-gauge cargo?
Restrictions along the route are reviewed against the cargo's dimensions and weight, and where required special permits, escort and time restrictions are clarified at the planning stage.
How is a transport plan built for project cargo?
The project parts list, assembly sequence and site arrival calendar are evaluated together. Shipment order is planned so that parts reach site without waiting on site.
How are loading and unloading operations for heavy equipment planned?
Lifting points, ground and weather conditions, crane capacity and alternative methods are assessed. The loading plan is prepared together with the vehicle specifications.
How is insurance structured for project cargo?
Scope is set based on cargo value, transit duration and the number of handling steps. Out-of-gauge and project cargo may require additional cover.
Are there special conditions for energy project shipments?
For power plant and infrastructure projects, site safety, road restrictions and work permits are included in the operating plan and coordinated accordingly.

Quote & Planning

Let's plan the right solution for your cargo together.

Share your origin and destination and cargo details; our team will get back to you with the right transport mode and quote scope.

+90 544 337 99 48gul@asellogistics.com.trMonday – Friday, 09:00 – 18:00
Get a Quote Now